EJ/T 20150.13-2018 Post-irradiation inspection of pressurized water reactor (PWR) rod bundle type fuel assemblies Part 13: X-ray inspection of fuel rods

Standard Number: EJ/T 20150.13-2018(EJ/T20150.13-2018)
Chinese:压水堆棒束型燃料组件辐照后检查 第13部分:燃料棒X射线检测
English:Post-irradiation inspection of pressurized water reactor (PWR) rod bundle type fuel assemblies Part 13: X-ray inspection of fuel rods

Effective Date:2018-05-01
Standard Applicability:This part specifies the method synopsis, inspectors, inspection equipment, inspection conditions, inspection steps and other contents of the post irradiation X-ray inspection of fuel rods for pressurized water reactor (PWR) rod-beam type fuel assemblies. This part applies to the post irradiation hot cell X-ray inspection of fuel rods of the fuel assemblies of the rod bundle type of pressurized water reactor.

PDF Downloadable: N

You can click the button below to purchase the PDF version, and we will send it to you via email.

Click below to buy the printed version. Shipped via FedEx within 7 days. Full refund if out of stock.

If you encounter the following issues, please click here to contact us, and we will do our best to assist you.
1. You cannot find the standard document you are looking for on our website.
2. You have found the standard document, but our page indicates that PDF download is not available.
3. You need to purchase our translated version.